BUILDING CONSTRUCTION

In the city, everywhere on the road, we will also encounter high-rise buildings. But to build these tall buildings is a multi-stage construction process. So let’s join DVH Group, learn the steps to build a high-rise building. The process of constructing a high-rise building Construction of high-rise buildings includes the following stages: Phase 1. Construction…



Details content

In the city, everywhere on the road, we will also encounter high-rise buildings. But to build these tall buildings is a multi-stage construction process. So let’s join DVH Group, learn the steps to build a high-rise building.

The process of constructing a high-rise building

Construction of high-rise buildings includes the following stages:

Phase 1. Construction of high-rise buildings need to be prepared?

Preparing for the construction of high-rise buildings is the most important stage. Decide whether the project is officially built or not.
  • The investor needs to prepare: documents, legal procedures, construction permits.
  • In addition, the investor also needs to prepare the design of the project, the detailed design.
  • More. Investors also need to find suppliers of materials and installation equipment.
  • Thus, the full preparation of the above steps. To help the construction of high-rise buildings, be carried out most smoothly.

Phase 2. Construction of the foundation of the high-rise building

  • Before proceeding to excavate the foundation for the project, it is necessary to treat the ground.
  • The construction company needs to fence to avoid affecting security and the surrounding environment.
  • Then need to probe the soil in that area to calculate how deep the foundation needs to be.
  • The next step is to dig the foundation for the building to pour concrete.
  • The construction unit will start pressing the reinforced concrete piles to create a solid foundation for the high-rise building.
The foundation of the building is the most important part. Therefore, it is required that the construction unit should have a lot of experience, in construction and professional knowledge.

Phase 3. Construction of the body of the high-rise building

  • From the iron piles waiting to continue making columns and pouring concrete on the basement floor.
  • The basement floor must ensure good waterproofing to avoid seepage back into the upper floors.
  • The upper floors are made from a reinforced concrete frame system, then proceed to construct walls and floors.
  • Continue to build walls around each floor, walls separating rooms.
At this stage, the installation of electricity, water, and fire protection equipment will also be carried out.

Stage 4. Construction of the roof of the high-rise building

  • The next stage is the construction of the roof for the high-rise building.
  • The construction unit will construct the insulation and waterproofing for the roof.
  • Then install bricks and tiles according to the design of the project.
  • The roof is the part that helps the building to avoid rain, sun, …
Therefore, it is required that the construction unit conducts construction carefully to avoid the bad effects of the weather and to increase the life of the building.

Stage 5. Completion of high-rise building

  • At this stage, it is considered that the construction of high-rise buildings has been completed by 50-60%.
  • The finishing works include laying floor tiles, installing door systems, painting walls,…
  • The next step will be to install the interior and exterior of the building at the request of the investor.
And after the interior and exterior installation is completed, general cleaning and cleaning of the building will be carried out to be ready for use.

Stage 6. A building inspection and handover

The final stage of the high-rise building construction process
  • Acceptance, assessment of the building to ensure the conditions to be put into use or not.
  • After the building is completed, the building will be handed over
  • Make payments to related parties.

DVH Group – Building construction unit

Thus, the construction of high-rise buildings or other works usually includes the above 6 steps. Construction stages have a relationship with each other. If the previous phase is not completed, the next step cannot be executed. With this article, DVH Group hopes that you have the most overview of the construction of high-rise buildings. And if you require construction work but have not made a satisfactory design or have not found a suitable construction unit, please contact our DVH Group immediately to receive the earliest help.

Contact

DVH GROUP 
Address: 196/1/19-21 Cong Hoa, Ward 12, Tan Binh District, HCMC
Office: 22 Nguyen Trung Ngan, Ben Nghe Ward, District 1, HCMC
Email: info@dvhgroupvn.com
Hotline: +84 28 668 06166
Or leave information for a quick and free consultation!

Contact Us

DVHGROUP CO., LTD
Address : 22 Nguyen Trung Ngan, Ben Nghe Ward, District 1, Ho Chi Minh City
Mobile : +84 975 969 608
WhatsApp : +84 975 969 608
Email: info@dvhgroupvn.com
Real estate consultant in Vietnam

Related news

Leave a Reply

Your email address will not be published. Required fields are marked *